TY - JOUR
T1 - Energy Efficiency, Spectral Efficiency and Delay Analysis for Selective ARQ Multichannel Systems
AU - Shafique, Taniya
AU - Abdelhady, Amr Mohamed Abdelaziz
AU - Amin, Osama
AU - Alouini, Mohamed-Slim
N1 - KAUST Repository Item: Exported on 2020-10-01
PY - 2018/9
Y1 - 2018/9
N2 - In this paper, we develop selective retransmission schemes for multiple-channel systems. The proposed schemes are selective automatic repeat request with fixed bandwidth, selective chase combining with fixed bandwidth, limited selective chase combining with fixed bandwidth and selective automatic repeat request with variable bandwidth. The main objective of the proposed schemes is to use the available power and bandwidth budget effectively along with selective retransmission to deliver the required data successfully within a limited number of transmissions. To investigate the performance of each scheme, we first analyze and derive closed-form expressions for the average spectral efficiency (SE), energy efficiency (EE) and delay for each scheme. Then, we compare the EE, SE and delay performance of each scheme versus different system parameters through numerical results.
AB - In this paper, we develop selective retransmission schemes for multiple-channel systems. The proposed schemes are selective automatic repeat request with fixed bandwidth, selective chase combining with fixed bandwidth, limited selective chase combining with fixed bandwidth and selective automatic repeat request with variable bandwidth. The main objective of the proposed schemes is to use the available power and bandwidth budget effectively along with selective retransmission to deliver the required data successfully within a limited number of transmissions. To investigate the performance of each scheme, we first analyze and derive closed-form expressions for the average spectral efficiency (SE), energy efficiency (EE) and delay for each scheme. Then, we compare the EE, SE and delay performance of each scheme versus different system parameters through numerical results.
UR - http://hdl.handle.net/10754/655925
UR - https://ieeexplore.ieee.org/document/8303739/
UR - http://www.scopus.com/inward/record.url?scp=85059903850&partnerID=8YFLogxK
U2 - 10.1109/TGCN.2018.2809729
DO - 10.1109/TGCN.2018.2809729
M3 - Article
VL - 2
SP - 612
EP - 622
JO - IEEE Transactions on Green Communications and Networking
JF - IEEE Transactions on Green Communications and Networking
SN - 2473-2400
IS - 3
ER -